Plan & successfully implement projects

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt.

from A to Z

Project planning

We would like to make you a fair & transparent offer and become your long-term partner.

1. Contact / Visit

On our specialized sales representatives' first visit, all of the necessary parameters will be recorded and the entire wastewater situation will be outlined.

2. Expirments

After sampling takes place, the preliminary tests for analysis are carried out in our in-house laboratory.

3. Planning / Quotation

We will offer a tailored quotation only after all results have been evaluated. In most cases, an on-site test will be performed afterwards.

4. Procurement

Production at WAP GmbH will start only when the last pipe has been scheduled.

5. Start-up

Our own assembly staff will set up the entire installation at the Sinzig plant and will be audited by our customers.

6. Maintenance & Service

All systems leaving our factory will be equipped with a MODEM/Interface to enable remote maintenance.

Projektauszug


01

Smurfit Kappa

Wellpappenwerk in Kreuzau

Filtration

  • vollautomatisch mittels Dekanter / Kammerfilterpresse

  • Durchsatz: bis 2,5 m┬│/h

Verfahren

  • Flockulationsverfahren

Projekt

  • Behandlung von Flexo- Druckabwasser

Adress:
Eisenbahnstra├če 22-23
53498 Sinzig (DE)

Contact:
+49 (0) 2642 90 76 170
@: This email address is being protected from spambots. You need JavaScript enabled to view it.